Tel: +86-371-65669681
Fax: +86-371-65669601
Email:[email protected]
Web: http://www.concrete-batching-plants.org/
1. When stating the concrete mixing machine, after the electric motor runs normally, close the clutch. Test it in empty for 2-3 minutes. If the mixing drum is normal, there is no abnormal effect, and open and close of feeding hopper and discharging door are flexible, concrete mixer can begin to work.
2. Operators should wear masks and sleeve during operating.
3. It is prohibited to repair and maintain concrete mixer in the working process, as well as stretching any tools to the mixing drum to mix mortar and discharge.
4. When the concrete mixer suddenly has a power failure or a failure occurs during overloading running, firstly cut down the power and eliminate the residual concrete in mixing drum. Don’t start concrete mixer when overloading to avoid damaging motor when the startup electric current is too big.
5. Mobile concrete mixer should be installed in the operation platform with wood board.
6. Do not work or walk through under the lifting feeding hopper. If the foundation pit of hopper needs cleaning and checking, contact with the operators and fasten the hopper by chain.
7. Open the water valve to add some water when the hopper is rising, and do not do this when charging the materials into the mixing drum.
8. Maintenance outage, you must remove the fuse inside the switch and lock brake box to ensure production safety.
Copyright 2010-2022 All Right Reserved Henan DASWELL Machinery Co.,Ltd.